Convert USDC to USDT TRC20

Convert USDC on Ethereum into USDT TRC20 on TRON in one transaction. Enter the amount, send USDC from your Ethereum wallet, and native USDT TRC20 lands on your TRON address in about 67 seconds — the exact rate and fee show in the widget before you sign. No sign-ups, no custody.

Swap
From
Ethereum ▾
USDC ▾
0.0
⇅
To
TRON ▾
USDT ▾
0.0
TRON recipient address ⊕ Connect wallet
TX8E...FqtJ
Rate [—] Fee [—] Slippage 0.5% ~[—] min
01Conversion rate

You send / you receive

rates as of
You send (ERC20) You receive (TRC20) Fee Time Action
50 USDC 46.97 USDT $3.03 ~1–2 min Convert →
100 USDC 96.95 USDT $3.05 ~1–2 min Convert →
500 USDC 496.73 USDT $3.27 ~1–2 min Convert →
1 000 USDC 996.45 USDT $3.55 ~1–2 min Convert →
5 000 USDC 4 994.23 USDT $5.77 ~1–2 min Convert →
10 000 USDC 9 991.38 USDT $8.62 ~1–2 min Convert →
50 000 USDC 49 965.10 USDT $34.90 ~1–2 min Convert →
100 000 USDC 99 859.55 USDT $140.45 ~1–2 min Convert →
02What this conversion is

Converting USDC to USDT TRC20

USDC and USDT are separate stablecoins — USDC issued by Circle, USDT by Tether — both pegged to $1 but backed and issued independently. Converting between them is a USDC to USDT swap at its core — it changes the token itself, not just the network, so the rate is close to 1:1 but not exactly 1:1.

This route does both moves at once: it swaps USDC for USDT and moves the result from Ethereum to TRON, landing native USDT TRC20 on your TRON address. You send native ERC20 USDC from your Ethereum wallet; nothing wrapped on either side.

People convert to USDT TRC20 specifically because it is the format most exchanges and OTC desks default to for USDT deposits, and transfers on TRON cost cents once you are there. The swap runs on audited routing infrastructure — Symbiosis, Chainflip and THORChain — and is fully non-custodial: no account, no KYC, no service holding your funds in between.

03Market data

USDC and USDT TRC20 market data

snapshot as of · sources: Dune, DefiLlama, Ethplorer, Tronscan, CoinGecko
USD Coin (USDC) on ERC20 · Ethereum

USD Coin (USDC)

ERC20 · Ethereum
$0.9996 +0.00% 24h
USDC on Ethereum
$46.32B
Volume (24h)
$45.36B
Holders
8.28M
Transfers (24h)
793K

USD Coin (USDC) on Ethereum currently trades at roughly $0.9996. Issued by Circle, USDC is the second-largest stablecoin and lives mainly on Ethereum — on TRON it barely exists, which is why converting to USDT is the practical way to bring dollars there.

Tether USD (USDT) on TRC20 · TRON

Tether USD (USDT)

TRC20 · TRON
$0.9991 -0.02% 24h
USDT on TRON
$89.88B
Volume (24h)
$28.25B
Holders
75.52M
Transfers (24h)
2.47M

Tether USD (USDT) on TRC20 currently trades at roughly $0.9991 and holds about 50% of all USDT in circulation — the largest share of any network. Issued by Tether on TRON under the TRC-20 standard — the busiest USDT rail: transfers settle in seconds and cost cents, which is why most OTC desks and exchanges prefer it.

04Before you send

Common mistakes when converting USDC to USDT

USDC and USDT are different tokens, not different networks of the same coin. Sending USDC straight to an address or a service that only holds USDT does not automatically become USDT — depending on the wallet or contract, the funds can be lost or become unrecoverable.

The second failure mode is the network, on top of the token: an Ethereum-side USDC send to a TRON address (or the reverse) fails the same way any wrong-network transfer does. Use a converter for this pair — swapping USDC ERC20 to USDT TRC20 handles the token swap and the network move as one signed transaction.

Also check the amount limits in the widget before you convert USDC to USDT TRC20 online — it rejects amounts outside the supported range before anything is signed.

Don't send USDC to the wrong network

Never send ERC20 USDC straight to a TRON address, or the other way around — the transfer will lose the funds. Already sent it? Here's what you can still do →

05How it works

How to convert ERC20 USDC to TRC20

01

Connect your wallets

An EVM wallet (MetaMask, Trust Wallet) for Ethereum and a TRON wallet for receiving — both stay in your control.

02

Pick networks and tokens

From: Ethereum · USDC ERC20. To: TRON · USDT TRC20 — preselected on this page.

03

Enter the amount and review

You see what you'll receive, the fee and the time before you sign anything.

04

Hit Swap and wait

Confirm in your wallet and wait for the operation to complete — USDT TRC20 lands on your TRON address in about 67 seconds.

My wallets modal with an EVM wallet and a TRON wallet connected before converting USDC ERC20 to TRC20
Swap widget with 1,000 USDC ERC20 entered: the exact USDT TRC20 amount you receive, the fee, the estimated time and the Convert button before signing
06Compare

No account, no KYC, no custody

The same conversion through an exchange means signing up, passing KYC and handing your USDC to someone else while it moves. Here is the full trade-off, price included.

Criterion TronBridgeExchange withdrawalCustodial swappers
Account & KYC ✓ none — connect a wallet ✗ sign-up and full KYC ~ KYC on larger amounts
Custody of your USDC ✓ stays in your wallet ✗ held by the exchange ✗ held while the swap runs
Steps ✓ one transaction ✗ deposit → trade → withdraw ~ one swap, varies
Time ✓ 67 seconds ✗ 64 confirmations, then processing ~ 10–60 minutes
Cost on 1 000 USDT ~ $3.55 ~ ≈ $3.00 ~ ≈ $17.24

The cost is about the same as the exchange path — without an account, KYC or custody. Exchange cost includes the Ethereum deposit transaction, a 0.1% spot conversion from USDC to USDT and the KuCoin withdrawal fee for TRON; custodial swapper quote from ChangeNOW. Quotes as of .

07Why USDT on TRON

Why convert to USDT TRC20 specifically

USDT dominates on TRON the way USDC dominates parts of Ethereum DeFi — most exchanges, OTC desks and payment counterparties that ask for a TRON deposit ask for USDT TRC20, not USDC, so holding the right stablecoin on the right network avoids a second conversion later.

TRC20 transfers are cheap and fast once your funds are on TRON, which is the other reason people route through this pair rather than moving USDC to TRON directly (USDC exists mainly on Ethereum and other networks — on TRON, USDT is the standard).

If your destination specifically wants USDC instead, this is not the right route — this page is for people whose next stop needs USDT on TRON.

08Other conversions

More USDT routes

09FAQ

USDC → USDT TRC20

Questions people actually search for this pair.

How to convert USDC to USDT TRC20? +

Enter the amount above, send USDC from your Ethereum wallet, receive USDT TRC20 on your TRON address. One transaction — the exact rate, fee and time show before you sign.

Can you convert USDC to USDT? +

Yes. They're different stablecoins (issued by Circle and Tether), both pegged to $1, so conversion is near 1:1 minus the fee — the exact rate shows in the widget before you sign.

Is TRC20 a USDT or USDC? +

Neither — TRC20 is Tron's token standard. USDT on Tron is «USDT TRC20». USDC exists mainly on Ethereum and other networks; on Tron, USDT dominates.

Can I send USDC to a USDT wallet address? +

Don't — they're different tokens, and if they're on different networks the transfer will lose funds. Use a converter: it swaps the token and the network in one step.

Why is the rate not exactly 1:1? +

USDC and USDT are separate assets; the rate reflects the live market between them plus the route fee. Typically within a small spread of 1:1 — the exact rate shows in the widget before you sign.

What are the fees? +

The exact fee shows in the widget before you sign — it scales with the amount you convert.

Do I need an account or ID? +

No. Non-custodial, no KYC.

Can I convert USDC to USDT on Binance or Coinbase? +

Yes — with an account, KYC and their withdrawal fees; Trust Wallet's built-in swap works too. The widget above does the same conversion from your own wallet with no sign-up, and delivers USDT directly on TRON, so you skip a separate network transfer afterwards.

Ready to convert?

USDT TRC20 in your wallet in about half a minute. No signups, no custody.